HomeWestern Area EnvironmentWard-Level Capital ImprovementsCivil Infrastructure PlansCity's AEC Growth PlansFAQsContact Us

 
LE Group team has kept abreast of current issue relevant to the Improvement of the critical Infrastructure of its current target country, Sierra Leone. 
This is reflected in the range of work we accomplished in-house and with local and international partners since 2008.

Typical Projects undertaken by LE Group Team

Water Supply Infrastructure and Services

Modeling of the complete GVWC Network on Epanet and Q-GIS platform - (2019)
Shortlisted to compete with Canadian (Cowater) and US Firm (Hazen) in Millenium Challenge Water Seector Development program funded by US Congress (2015) 
Water Supply Services. Installation and Migration of Guma Valley Water Company (Freetown) to EDAMS utility software with GIS and network distribution model integration. Systems Engineer for Hydrocomp (Cyrus) -2014
Field assessment, EPANET models and ARCGIS Geodatabase development to support rehabilitation of Guma Valley Water Company (GVWC) supply and distribution system.(2013)

Energy Infrastructure and Services
Design of Solar Power System for the Policy and Planning Department of the Ministry of Education. (2014)
Responsible for project management, civil works, camp development of Geotechnical Investigation for Joule Africa's 300MW Bumbuna Phase2 Geotechnical Investigation.(2012)
Supervision of Mini Hydros: Charlotte, Bankaoska and Makalie. This is a development initiative of three Mini-Hydros across the country though an agreement between the Chinese and Sierra Leonean Governments. (2013)

Environment and Solid Waste Infrastructure and Services

Design and piloted street waste collection system and planned routing for pick up for Masada. (2014) 
Geotechnical Investigation to support the complete Rehabilitation of the Caterpillar Mantrac Compound at east end of Freetown.(2012)
Solid Waste Assessment of York Village in support of Sweet Salone Resort (Now The Place. (2011)

Land and Buildings
Engineering services of Monuments and Relics preservation, renovation and rehabilitation program for Monuments and Relics Commission. (2015)
Design and supervision of components of the Temporary Health Center Kerry Town (2015)

Site Development
Design for the Old Fourah Bay College building, Clinetown (2014)
Assessment and ICT Infrastructural design for refurbishment for ICT and Power backups for EMIS project at the Planning Building Ministry of Education Science and Technology (2015)
Sanitation Facilities. Design and Construction supervision of sanitary facilities for the Hilton Cape Sierra Hotel construction camp by Sharpooji Pallonji MidEast (India). Hilton Cape Sierra is an Idea (UK) Project, 2014
Engineering services of infrastructure rehabilitation program of the Freetown Aqua Sports Club. (2012)
Preliminary site development for a multi-storey Hotel at Lungi and Detailed design a high-end resort at Tokeh Beach. (2011)
Preliminary development of infrastructure projects to rehabilitate the Iron Marampa Mine's building complexes, water systems, power systems, road networks (2009 -2011)


Transportation
Design of Jetty on Bunce Island, a Historic world site within the Sierra Leone River that World Monuments Fund has listed on the 2016 World Monuments Watch (2015)
Design and Construction Supervision of Pedestrian Bridge at Kroobay delta inclusive of Geotechnical Investigation for Save the Children International (UK) 2013
Design and implementation of 11Km Access Road to Yiben Dam site beginning with a Bridge at the Katanga Crossing in the Northern Province(2012)
Rehabilitation Studies for 11 Jetties of the Sierra Leone Maritime Administration.(2008)